Skip to main content
PIPING.TOOLS
Features
Scan drawingsSend drawing issuesFinal project filesWelding proceduresWeld logCut listMaterial certificatesInspection reportsProgressInspection resultsLoad planningProject trashTeam
BOM generatorWeld logsISO trackingSubmittalsPQR managementProgress trackingQR codes
Browse all tools →
How It WorksExample drawingPricingOpen my accountCreate a free account
Fabrication management

Fabrication management with one source of truth for the shop

Keep drawings, weld procedures, welder qualifications, material certs, NDE reports, and turnover packs linked to the same job for review.

  • Central drawing register with revision control and PDF upload
  • Weld procedures (WPS / PQR) and welder qualifications attached to each weld
  • Material certs (MTRs) linked to the heat numbers they cover
  • Turnover packs assembled from reviewed project records
  • Transmittals tracked end-to-end with audit history
Create a free accountAll workspace features

One workspace for connected fabrication records

A pipe shop runs on many record types: drawings, transmittals, WPS, welder logs, NDE reports, material certs, hydrotest sign-offs, and punch lists. Piping.Tools can keep supported records in the same workspace and link them through the drawing the work belongs to.

Built around how the shop actually transmits and hands over

Transmittals send what was issued. Turnover packs assemble what was completed. Both are built from the same underlying records, so the package an inspector signs is the same package the engineer issued — only with the welds, NDE, and certs filled in along the way.

Where it lives in the product

The workspace tabs that deliver it

Each card jumps to the dedicated feature page for that workspace tab — same data you see in the product, explained in detail.

  • Piping.Tools Drawings register with upload dropzone and table of isometric drawingsMock screenshot of the Drawings workspace tab showing an upload dropzone above a table of drawing numbers, revisions, status, weld count, and footage metrics.Piping.ToolsDashboardENGINEERING & QADrawingsTransmittalsTurnover PacksProceduresWeld LogCut ListMaterial CertsNDT ReportsBOM ConverterOPERATIONS & PLANNINGProgressNDT MetricsLoadsProject TrashORGANIZATIONTeamActivity LogDrawingsSearch drawings…Batch Scan (0)Create Transmittal (0)Weld LogCut ListBOMUpload DrawingsDrag & Drop or click to browse (PDF)Upload drawings here and scan to generate bill of material0 B usedDrawing NoSheet #RevStatusTransmittalActual WDIWeldsISO-009120CurrentNot Transmitted153.4047E2E-PERF-011110CurrentNot Transmitted97.4040E2E-PERF-010100CurrentNot Transmitted97.4040E2E-PERF-00990CurrentNot Transmitted97.4040E2E-PERF-00880CurrentNot Transmitted97.4040E2E-PERF-00770CurrentNot Transmitted97.4040E2E-PERF-00660CurrentNot Transmitted97.4040MF0089383210CurrentNot Transmitted0.000

    Drawings register

    A central drawing register that ingests PDFs, tracks revisions, and links every weld and BOM item to its source isometric.

    Open Drawings register
  • Piping.Tools Transmittals workspace listing drawing transmittal packagesPiping.ToolsDashboardENGINEERING & QADrawingsTransmittalsTurnover PacksProceduresWeld LogCut ListMaterial CertsNDT ReportsBOM ConverterOPERATIONS & PLANNINGProgressNDT MetricsLoadsProject TrashORGANIZATIONTeamActivity LogTransmittalsSearch transmittals…Export PDFNew TransmittalTransmittal #SubjectDrawingsIssuedStatusAcknowledgmentTRN-2026-014IFC pipe rack rev B124/18/2026Acknowledged100%TRN-2026-013Tie-in package P-0484/16/2026Issued60%TRN-2026-012Module M-3 ISOs244/14/2026Issued60%TRN-2026-011Hot tap revision34/12/2026Acknowledged100%TRN-2026-010Steam header redline64/10/2026Issued60%TRN-2026-009Vendor markup batch114/08/2026Draft10%TRN-2026-008Loop check package174/05/2026Acknowledged100%TRN-2026-007Spool issue ABC54/02/2026Issued60%

    Transmittals

    Track what was issued to whom and when, with revision history and acknowledgements, so transmittal status is never in doubt.

    Open Send drawing issues
  • Piping.Tools Turnover Packs workspace gridPiping.ToolsDashboardENGINEERING & QADrawingsTransmittalsTurnover PacksProceduresWeld LogCut ListMaterial CertsNDT ReportsBOM ConverterOPERATIONS & PLANNINGProgressNDT MetricsLoadsProject TrashORGANIZATIONTeamActivity LogTurnover PacksSearch packs…TemplatesNew PackPack A — Loop 110ApprovedITEMS · 124100%Hydrotest sign-offPack B — Loop 211In ReviewITEMS · 11886%Hydrotest sign-offPack C — Loop 305BuildingITEMS · 9264%Hydrotest sign-offPack D — Loop 412BuildingITEMS · 7841%Hydrotest sign-offPack E — Loop 520DraftITEMS · 00%Hydrotest sign-offPack F — Tie-insApprovedITEMS · 56100%Hydrotest sign-off

    Turnover packs

    Inspector-ready packs that bundle drawings, weld logs, NDT reports, and material certs around each loop or system.

    Open Final project files
  • Piping.Tools Procedures workspace listing WPS and NDE qualificationsPiping.ToolsDashboardENGINEERING & QADrawingsTransmittalsTurnover PacksProceduresWeld LogCut ListMaterial CertsNDT ReportsBOM ConverterOPERATIONS & PLANNINGProgressNDT MetricsLoadsProject TrashORGANIZATIONTeamActivity LogProceduresSearch procedures…Import WPSNew ProcedureWPS-1.1GTAW root + SMAW fill, CSPQR · PQR-014QualifiedView · Welders ›WPS-2.0GTAW only, SS 304/304LPQR · PQR-022QualifiedView · Welders ›WPS-3.4GTAW root, FCAW fill, CSPQR · —Pending PQRView · Welders ›WPS-4.1SMAW carbon-to-stainlessPQR · PQR-031QualifiedView · Welders ›WPS-5.0GTAW orbital, P22 alloyPQR · PQR-018ExpiredView · Welders ›NDE-RT-01Radiographic exam, B31.3PQR · NDEQualifiedView · Welders ›NDE-PT-02Liquid penetrant examPQR · NDEQualifiedView · Welders ›

    Weld procedures

    Manage WPS / PQR documents and welder qualifications and link them directly to the welds they cover.

    Open WPS & procedures
  • Piping.Tools Material Certs workspace with MTR card gridPiping.ToolsDashboardENGINEERING & QADrawingsTransmittalsTurnover PacksProceduresWeld LogCut ListMaterial CertsNDT ReportsBOM ConverterOPERATIONS & PLANNINGProgressNDT MetricsLoadsProject TrashORGANIZATIONTeamActivity LogMaterial CertsSearch heat #, spec, supplier…Bulk ImportUpload MTRMTR · H72184A106 Gr B · 6" SCH40VerifiedSpec match: 100%View MTR ›MTR · H72190A106 Gr B · 4" SCH40VerifiedSpec match: 100%View MTR ›MTR · H72204A312 TP304L · 3" SCH40PendingSpec match: 100%View MTR ›MTR · H72211A234 WPB · 6" ElbowVerifiedSpec match: 100%View MTR ›MTR · H72219A105N · 600# FlangeMismatchSpec match: 100%View MTR ›MTR · H72226A182 F316L · 2" TeeVerifiedSpec match: 100%View MTR ›

    Material certs

    Upload MTRs, link them to the heat numbers they cover, and surface them automatically in the turnover pack.

    Open Material certificates
  • Piping.Tools Team workspace with invite panel and member rosterPiping.ToolsDashboardENGINEERING & QADrawingsTransmittalsTurnover PacksProceduresWeld LogCut ListMaterial CertsNDT ReportsBOM ConverterOPERATIONS & PLANNINGProgressNDT MetricsLoadsProject TrashORGANIZATIONTeamActivity LogTeamSearch by name, email, role…Manage rolesInvite memberInvite engineers, welders, and inspectorsRole-based access keeps QA records auditable. Invite by email, choose a role, done.email@company.comInviteMemberRoleStatusLast activeALAnna Luceroanna@acme.engOwnerActiveToday⋯MPMiguel Patelmp@acme.engQA LeadActiveToday⋯BOBeatrix Owensbo@acme.engInspectorActiveToday⋯JRJorge Reyesjr@acme.engWelderActiveToday⋯KPKira Parkkp@acme.engWelderActiveToday⋯MDMarc Delgadomd@acme.engWelderPending inviteToday⋯TRTasha Roblestr@acme.engProject ManagerActiveToday⋯

    Team & qualifications

    Welders, fitters, inspectors and engineers in the same place, with role-based access and qualifications tracked over time.

    Open People and access

FAQs

What does Piping.Tools manage on the shop floor?
Supported workflows include drawings, transmittals, weld logs, weld procedures (WPS / PQR), welder qualifications, NDT reports, material certificates (MTRs), turnover packs, loads, and shipping. Configured relationships help reviewers navigate between a pack and its source records.
How is this different from a generic project-management tool?
Piping.Tools models welds, WPS records, MTRs, and turnover packs as domain records. Configured relationships can connect a weld to its procedure, welder, and material context, while qualified personnel remain responsible for checking project and code requirements.
Does it replace our QA or document-control system?
That depends on the required records, integrations, approval model, and customer deliverables. A paid pilot should test the intended workflow before any replacement or integration decision is made.
Can multiple shops or projects run side-by-side?
Yes. Projects are first-class, and team membership is scoped per project. A welder on one job and an inspector on another can share the same login while only seeing what they should.
PIPING.TOOLS

Scan piping drawings into weld logs and parts lists, check every result, and download the finished record as Excel or PDF.

© 2026 Piping Tools Limited

Product

  • Scan drawings
  • Weld log
  • Send drawing issues
  • Welding procedures
  • Final project files
  • Track progress
  • Inspection reports
  • All tools →

Company

  • Team plans
  • Pricing
  • Privacy Policy
  • Terms of Service

Resources

  • Resource Library
  • Free Weld Log Templates
  • ASME B31.3 Weld Log Guide
  • Fabrication Weld Log Sheet
  • Weld Map vs Weld Log
  • Weld Log Glossary
  • Manual vs Scanned Weld Log
  • WeldLog.tech

Piping Tools Limited • Privacy and terms published above

Made for piping fabrication teams