Skip to main content
Prepare the final handover

Build the handover pack as the job moves

Pick a loop or system and gather the drawings, welds, NDE, MTRs, and hydrotest sign-offs already recorded for it.

Available in personal and company projects.

  • Gather drawings, welds, inspections, certificates, and sign-offs
  • Arrange the pack to match the project requirements
  • See whether each pack is being built, reviewed, or approved
  • Download one PDF with bookmarked sections
Piping.Tools Turnover Packs workspace gridPiping.ToolsDashboardENGINEERING & QADrawingsTransmittalsTurnover PacksProceduresWeld LogCut ListMaterial CertsNDT ReportsBOM ConverterOPERATIONS & PLANNINGProgressNDT MetricsLoadsProject TrashORGANIZATIONTeamActivity LogTurnover PacksSearch packs…TemplatesNew PackPack A — Loop 110ApprovedITEMS · 124100%Hydrotest sign-offPack B — Loop 211In ReviewITEMS · 11886%Hydrotest sign-offPack C — Loop 305BuildingITEMS · 9264%Hydrotest sign-offPack D — Loop 412BuildingITEMS · 7841%Hydrotest sign-offPack E — Loop 520DraftITEMS · 00%Hydrotest sign-offPack F — Tie-insApprovedITEMS · 56100%Hydrotest sign-off

Bring the pack together as you go

Choose a system, loop, or area and gather the linked drawings, welds, NDE reports, material certs, hydrotest results, and punch-list items into one pack.

A pack that matches your requirements

Set the section order and required records around your project and client requirements, then review the pack before it is issued.

What you get

Built from the current records

A newly generated pack uses the project records available at generation time and remains subject to final review.

See what is missing

See exactly which packs are ready, which are mid-review, and which are waiting on a cert or hydrotest.

One file to share

Issue the pack as one bookmarked PDF or share it online with the people allowed to see it.

Frequently asked questions

What gets included in a turnover pack?

Drawings, weld logs, NDT reports, material certs (MTRs), procedure references (WPS / PQR), hydrotest records, and punch-list closeouts — anything linked to the loop or system you select.

Can I customize the pack template?

Yes. Templates are configurable per project. You can choose section order, mandatory documents, and naming conventions, and the same template can be reused across multiple loops.

Does it support B31.3 mechanical completion packages?

Yes. The default templates align with ASME B31.3 fabrication and mechanical completion expectations, including weld traceability, NDE coverage, and hydrotest documentation.