Skip to main content
Packages that are ready to send

Drawing packs ready to send

Pull selected drawings into a fabrication pack, check the combined BOM and cover sheet, and give the field team a QR link when it helps.

Piping.Tools Transmittals workspace listing drawing transmittal packagesPiping.ToolsDashboardENGINEERING & QADrawingsTransmittalsTurnover PacksProceduresWeld LogCut ListMaterial CertsNDT ReportsBOM ConverterOPERATIONS & PLANNINGProgressNDT MetricsLoadsProject TrashORGANIZATIONTeamActivity LogTransmittalsSearch transmittals…Export PDFNew TransmittalTransmittal #SubjectDrawingsIssuedStatusAcknowledgmentTRN-2026-014IFC pipe rack rev B124/18/2026Acknowledged100%TRN-2026-013Tie-in package P-0484/16/2026Issued60%TRN-2026-012Module M-3 ISOs244/14/2026Issued60%TRN-2026-011Hot tap revision34/12/2026Acknowledged100%TRN-2026-010Steam header redline64/10/2026Issued60%TRN-2026-009Vendor markup batch114/08/2026Draft10%TRN-2026-008Loop check package174/05/2026Acknowledged100%TRN-2026-007Spool issue ABC54/02/2026Issued60%

Build the pack

Select and review the drawings that belong in one fabrication pack before it reaches the shop floor.

One clear material list

Bring the material lines from the drawing pack into one list with a cover sheet your team can review.

Keep the field in the loop

Add QR links to selected drawings so the field team can open the right record and keep updates beside the work.

Make handover easier

Create a free account