See job progress

A progress view the whole team can use

See WDI, weld completion, open NDE, and schedule status by area, system, or package as the records are updated.

Available in personal and company projects.

  • See welds complete, open inspections, and WDI
  • Compare the last 7, 14, or 30 days
  • View progress by area, system, drawing, or package
  • Download a PDF for the weekly report
Piping.Tools Progress workspace with KPIs and trend chartsPiping.ToolsDashboardENGINEERING & QADrawingsTransmittalsTurnover PacksProceduresWeld LogCut ListMaterial CertsNDT ReportsBOM ConverterOPERATIONS & PLANNINGProgressNDT MetricsLoadsProject TrashORGANIZATIONTeamActivity LogProgressFilter by drawing, area, system…Export PDFRefreshWELDS COMPLETE1,284+38 this weekWDI %78.6%+4.2%OPEN NDT46−12 vs last wkON SCHEDULE92%greenWeld throughput (last 14 days)WDI by drawing packageP-01P-02P-03P-04P-05P-06P-07AreaPlanned weldsComplete% DoneArea 100 — Inlet42038892%Area 200 — Reactor51040279%Area 300 — Utility28624485%Area 400 — Tankage19811659%

Progress that comes from the work

The dashboard uses the weld log, NDE reports, and schedule already recorded in the project, so the team does not have to maintain a second progress sheet.

See what is behind the number

Open a slipping area to see the drawings, welds, and NDE work behind it, then give the same view to the foreman who can act on it.

What you get

Weekly report

Prepare a PDF export from the recorded progress data for the weekly review.

Trend lines

Throughput trend over time tells you whether the curve is bending the right way.

Based on recorded activity

Dashboard values update from weld and NDT records entered in the project.

Frequently asked questions

How is WDI calculated?

WDI is computed from the weld inch diameter completed against the planned weld inch diameter for the selected scope (drawing, area, system, or package).

Can I choose what the progress page shows?

Yes. Choose the numbers and charts that match what your team reports each week.

Does it integrate with our schedule?

Schedule milestones can be imported and linked to drawings or packages so the dashboard surfaces planned-vs-actual instead of just actuals.