One report, every linked weld
A single NDT report can cover dozens of welds. Each weld’s acceptance is captured individually, so a single rejected weld becomes a tracked repair without disturbing the rest of the report.
File RT, UT, PT, and MT reports against the welds they cover, record acceptance, and keep repair history easy to follow.
Available in personal and company projects.
A single NDT report can cover dozens of welds. Each weld’s acceptance is captured individually, so a single rejected weld becomes a tracked repair without disturbing the rest of the report.
When a weld fails NDE, record the repair welder, repair WPS, and re-inspection beside the original weld so the full history stays together.
Record RT, UT, PT, and MT, with other methods added when the project needs them.
Every report stores who inspected, when, where, and the original PDF as filed.
Failed welds open a repair record automatically; the next NDE cycle updates the original log.
A failed weld automatically opens a repair record. The repair is welded, re-inspected, and the result is linked back to the original weld so the history is complete.
Yes. Bulk-import historical NDT reports as PDFs and tag them to welds and drawings retrospectively.
Each report keeps the inspector’s identity. Their qualification records can be kept with the welding procedures and welder qualifications.